SpaceNukes Opens New Advanced Materials Facility in Los Alamos to Power Next-Generation Space Reactors

LOS ALAMOS, N.M. — Space Nuclear Power Corp., widely known as SpaceNukes, has officially opened its new Manufacture and Materials Development Facility located at 150 Central Park Square in Los Alamos. The ribbon-cutting ceremony took place on November 13, marking a significant milestone for the private aerospace firm as it ramps up development for its ambitious Generation 2 space fission power systems.

The newly inaugurated facility is explicitly dedicated to advanced manufacturing and materials research tailored for the company’s next-generation reactors. Specifically, the workspace will house advanced additive manufacturing equipment capable of working with nickel-based and high-performance refractory alloys. Company officials noted that the facility will remain entirely non-radioactive, as no radioactive materials will be handled on-site. Instead, the focus of the Los Alamos workshop is entirely on overcoming the physical and metallurgical barriers that have historically limited high-temperature nuclear applications in space.

Pushing the Limits of Temperature and Mass in Space Fission

The core engineering motivation behind the new facility is a matter of thermal physics and payload mass. SpaceNukes’ Generation 2 reactor is engineered to operate at significantly higher temperatures than traditional space power systems. In the realm of space exploration and satellite design, system mass is heavily dictated by the thermal radiators required to shed waste heat into the vacuum of space.

By running a nuclear reactor much hotter, the temperature differential increases, allowing a much smaller radiator to shed vastly greater amounts of thermal energy. According to company projections, raising the heat-rejection temperature enables a radiator of the exact same size to dissipate roughly six times as much heat.

However, this design philosophy runs into a fundamental limitation rooted in materials science rather than nuclear physics. Conventional power conversion hardware currently operates near the absolute threshold of what traditional nickel-based superalloys can endure over extended multi-year missions. To push operating temperatures even higher, SpaceNukes must transition to refractory alloys—metals such as tungsten, molybdenum, tantalum, rhenium, and niobium.

These exotic metals are notoriously difficult to machine, shape, and form. Many of the intricate component geometries and material compositions required for the Generation 2 architecture cannot be purchased off-the-shelf from existing aerospace suppliers, necessitating an in-house manufacturing capability.

"Our next-generation reactor is a bet on temperature," said Andrew Phelps, Chief Executive Officer of SpaceNukes, during the grand opening event. "What stands between us and that is not the nuclear physics. The physics is in good shape, and it was proven in 2018. The limit is metal. Our next reactor is a materials and manufacturing challenge before it is a reactor problem, and that is what this building is for."

SpaceNukes Opens Los Alamos Manufacture and Materials Facility to Build Its Next-Generation Space Reactor

Aerospace-Quality Standards for Extreme Environments

Leadership for the new Los Alamos facility and the broader Generation 2 program is spearheaded by Omar Mireles, director of manufacture and materials at SpaceNukes. Mireles brings deep domain expertise to the role, having previously spent 13 years as a research engineer and principal investigator at NASA’s Marshall Space Flight Center. During his tenure at the space agency, Mireles led the high-profile $25 million Refractory Alloy Additive Manufacturing Build Optimization project, giving him unique insights into the exact metallurgical hurdles SpaceNukes now aims to clear.

"Additive manufacturing is used only for specific circumstances," Mireles explained during the facility’s opening remarks. "You have parts that are highly complex, made from materials that are difficult to form, have a low production rate that won’t benefit from economy of scale, and have the design flexibility that can optimize designs to the manufacturing process. These lessons were learned over the last two decades in the liquid rocket engine community, and we are applying them to the needs of SpaceNukes, which have very similar conditions. We are manufacturing aerospace components at aerospace-quality standards. This building is where we learn to make them."

The establishment of the Los Alamos facility does not stand alone in SpaceNukes’ operational footprint. It is designed to complement the company’s existing integration and test facility located in Medina, Ohio, which is under the direction of chief engineer Marc Gibson. With the new New Mexico site operational, SpaceNukes is actively fabricating hardware in Ohio to rigorously test components for its upcoming reactor iterations.

A Celebrated Milestone and Broader Industry Momentum

The grand opening celebration drew a diverse crowd of local dignitaries, government officials, financial partners, and aerospace industry stakeholders. Attendees included staff members representing the office of U.S. Senator Martin Heinrich, leadership from the Los Alamos National Laboratory and its Feynman Center for Innovation, and members of the Los Alamos County Council. Representatives from the Los Alamos County Community Development Department, the Los Alamos Commerce & Development Corp., the Los Alamos Chamber of Commerce, Century Bank, and Merrill Lynch were also present to witness the ribbon-cutting and tour the state-of-the-art facility.

The opening of the materials development center comes on the heels of major strategic momentum for the company. On October 21, SpaceNukes announced a major agreement with the Defense Advanced Research Projects Agency (DARPA). Under DARPA’s Fast Capacitance program—informally known as "Fat Cat"—the company is collaborating with Los Alamos National Laboratory to design, construct, and ground-test an actively controlled Kilopower reactor. This initiative aligns with the company’s aggressive timeline to fly a fully operational nuclear reactor in space by 2028.

About Space Nuclear Power Corp.

Headquartered in Los Alamos, New Mexico, Space Nuclear Power Corp. specializes in engineering robust nuclear reactors designed to supply continuous, reliable power for government and commercial missions throughout the solar system.

The core team behind SpaceNukes achieved a historic milestone in March 2018, successfully operating a space reactor at full temperature and power for 28 hours with performance that matched computer predictions down to the letter. That achievement marked the first time a space fission reactor had been successfully operated at full power in the United States in half a century. Notably, the team accomplished the feat by taking the concept from initial design to full power in just three years with a budget of less than $20 million.

Today, SpaceNukes operates with a lean team of approximately 15 full-time employees, backed by more than $50 million in active contracts and agreements spanning both the Department of War and NASA. The company also holds two completed Space Force design reviews and maintains an official license from Los Alamos National Laboratory for the advanced reactor technology originally invented there by the company’s founders. SpaceNukes remains firmly dedicated to advancing safe, affordable, and dependable nuclear power solutions wherever human presence and robotic exploration reach in space.

Share:

Iffa Jayyana writes for Tech Maze.