LOS ALAMOS, N.M. — Space Nuclear Power Corp., known widely as SpaceNukes, officially opened its cutting-edge Manufacture and Materials Development Facility on November 13 at 150 Central Park Square in Los Alamos, New Mexico. The newly inaugurated facility is dedicated entirely to the manufacturing processes and materials development required for the company’s Generation 2 nuclear reactor line. Specifically, the center will focus on the advanced additive manufacturing of nickel-based and refractory alloys. Company officials noted that no radioactive materials will be handled at this specific location, as its primary purpose is mechanical and metallurgical innovation rather than nuclear fuel assembly.
The grand opening event brought together local leadership, state political representatives, and major players in the aerospace sector. Attendees and participants included staff members from the office of Senator Martin Heinrich, representatives from Los Alamos National Laboratory and its Feynman Center for Innovation, the Los Alamos County Council, the Los Alamos County Community Development Department, the Los Alamos Commerce and Development Corp., the Los Alamos Chamber of Commerce, Century Bank, Merrill Lynch, and various space industry partners. The celebration featured formal remarks from company executives, a traditional ribbon-cutting ceremony, and guided tours of the newly established workspace.
This strategic expansion comes on the heels of a major operational milestone for SpaceNukes. On October 21, the company announced a landmark agreement with the Defense Advanced Research Projects Agency (DARPA). Under DARPA’s Fast Capacitance program, often referred to as Fat Cat, SpaceNukes will design, build, and ground-test an actively controlled Kilopower reactor in partnership with Los Alamos National Laboratory. This momentum aligns with the company’s aggressive timeline to successfully fly a nuclear reactor into space by the year 2028.
Betting on Temperature to Overcome Space Mass Limitations
The core philosophy driving the design of SpaceNukes’ Generation 2 reactor is centered on thermal efficiency. In space fission power systems, the radiator components typically account for the vast majority of the overall mass. By engineering a reactor designed to run at significantly higher temperatures, engineers can dramatically reduce the required size of the radiator. Raising the heat-rejection temperature allows a radiator of the same physical dimensions to shed roughly six times as much heat as a conventional, lower-temperature system.
However, achieving these elevated operating temperatures presents a major engineering bottleneck that has little to do with nuclear physics and everything to do with metallurgy.
“Our next-generation reactor is a bet on temperature,” said Andrew Phelps, CEO of SpaceNukes. “What stands between us and that is not the nuclear physics. The physics is in good shape, and it was proven in 2018. The limit is metal. Our next reactor is a materials and manufacturing challenge before it is a reactor problem, and that is what this building is for.”
Conventional power conversion hardware currently operates right at the threshold of what standard nickel-based superalloys can tolerate over long-duration missions. To push past these limits and achieve higher operational temperatures, SpaceNukes must transition to refractory alloys—specifically metals such as tungsten, molybdenum, tantalum, rhenium, and niobium. These materials possess exceptional heat-resistant properties, but they are notoriously difficult to form and shape. Many of the complex component geometries and specialized material compositions required by SpaceNukes simply cannot be purchased off-the-shelf from commercial suppliers.

Applying Aerospace Lessons to Refractory Manufacturing
To overcome these severe fabrication hurdles, the new Los Alamos facility will operate under the leadership of Omar Mireles, who serves as the director of manufacture and materials and heads the Generation 2 program. Mireles brings deep expertise to the role, having spent 13 years as a research engineer and principal investigator at NASA’s Marshall Space Flight Center. During his tenure at NASA, he led the $25 million Refractory Alloy Additive Manufacturing Build Optimization project, giving him unique insights into the exact manufacturing challenges SpaceNukes now faces.
According to Mireles, advanced manufacturing techniques will play a critical, highly targeted role in producing the necessary hardware.
“Additive manufacturing is used only for specific circumstances,” Mireles explained. “You have parts that are highly complex, made from materials that are difficult to form, have a low production rate that won’t benefit from economy of scale, and have the design flexibility that can optimize designs to the manufacturing process. These lessons were learned over the last two decades in the liquid rocket engine community, and we are applying them to the needs of SpaceNukes, which have very similar conditions. We are manufacturing aerospace components at aerospace-quality standards. This building is where we learn to make them.”
The Los Alamos manufacturing hub is designed to operate in tandem with the company’s existing integration and test facility located in Medina, Ohio. That facility is led by chief engineer Marc Gibson, and it is currently where SpaceNukes is actively building hardware to test components for the Generation 2 reactor line.
A Proven Team with Deep Roots in Nuclear Innovation
Space Nuclear Power Corp. traces its foundational technology directly back to pioneering work conducted at Los Alamos National Laboratory. The company’s founders invented the core reactor technology, which has since been licensed from the laboratory.
In March 2018, the core team that now forms SpaceNukes achieved a major historical breakthrough when they successfully ran a space reactor at full temperature and full power for 28 consecutive hours. The system performed precisely as predicted by computer models, marking the first time such a feat had been accomplished in the United States in half a century. Remarkably, that team took the reactor concept from initial design to full power in just three years for a total cost of less than $20 million.
Today, SpaceNukes operates as a lean, highly specialized organization with roughly 15 full-time employees. Despite its compact size, the company has secured more than $50 million in contracts and agreements with the Department of War and NASA, successfully completed two Space Force design reviews, and established itself as a frontrunner in the commercial and government space nuclear power sector. Headquartered in Los Alamos, the company remains focused on delivering safe, affordable, and reliable nuclear energy solutions to support human and robotic exploration wherever it is needed in space.

